Welcome to tnhighways   Click to listen highlighted text! Welcome to tnhighways Powered By GSpeech

Map for Ongoing Work

METRO WING

          The economic growth and development of a Metropolitan city within a State is a growth indicator. The infrastructural developments provide the necessary trigger. Faster and safer mobility, seamless multi-modal traffic movement is the key solution. With this objective, to provide better connectivity and sustainable transport solutions to the growing demand of Chennai Metropolitan Area (CMA), the Chennai Comprehensive Traffic and Transportation Study (CTTS) was initiated by the Chennai Metropolitan Development Authority (CMDA). An exhaustive study was conducted during 2007 through the nook and corner of CMA, exploring all the resources.

          The goal of CTTS is to provide solutions for the challenging transportation issues and shoulder the increasing traffic burden within CMA. Various transport strategies have been proposed to address the growing traffic demands in CMA.

          Metro wing was established to implement the projects for the improvement of transport network in and around Chennai City. This wing is headed by the Chief Engineer and functions with a Superintending Engineer and 5 Divisional Engineers. The Metro wing plays a significant role in realizing the vision of 2nd Master plan.

          With an aim to decongest the urban traffic stream and to reduce road accidents within the CMA, the road network improvement plans such as Grade-separated facilities, High level bridges, ROB / RUBs, Widening of roads/ bridges and forming link roads, Pedestrian - specific projects such as Foot Over Bridges(FOB), Skywalks and Subways are being implemented by this wing.

The projects are as follows:-

GRADE SEPARATORS

Sl. No Nomenclature Cost (Rs. in Crore)
Works in Progress

1

Construction of a Grade Separator at the junction of Kundrathur road and Santhai road at Pallavaram in GST road

82.66

2

Construction of a Grade Separator at the junction of Taramani road, Tambaram – Velachery road and Velachery bypass in Velachery Vijayanagaram junction.

108.00

3

Construction of a Grade Separator connecting the junctions of Mofussil bus entrance of CMBT and Kaliamman Koil Street junction in Jawaharlal Nehru Salai (IRR)

93.50

4

Grade Separator at Medavakkam – Sholinganallur road junction, Medavakkam – Mambakkam road junction and Mount – Medavakkam junction in Maramalai Adigal Bridge – Irumbuliyur (MBI) road.

146.41

5

Construction of Grade Separator at the intersection of Mount Medavakkam road and Pallavaram-Thuraipakkam road near Kilkattalai

64.00

6

Construction of a Grade Separator at the junction of Perambur – Redhills road near Kolathur Rettai Eri (RHS) in Inner Ring Road

41.08

Land Aquisition in Progress

7

Forming Grade Separator at the junction of ECR –Thiruvanmiyur road

58.00

TOTAL

593.65

The preparation of DPR is in progress for the following 14 Grade Separator proposals.

  • At the junction of ECR and Lattice bridge road at Thiruvanmiyur.
  • At intersection of Southern Sector of Inner Ring Road with Mount-Medavakkam road at Madipakkam.
  • At the intersection of Mount – Poonamallee –Avadi road and Poonamallee – Kundrathur road with Chennai – Chittur - Bengaluru road at Poonamallee – Kattupakkam
  • In EVR salai at the intersection from Raja Muthiah Salai to Pulla Avenue.
  • Forming six lane of ECR from Km: 11/8-23/2 Thiruvanmiyur to Akkarai including Grade Separator.
  • Providing Four lane Grade Separator at Km 76/8 of NH-205 (Chennai -Thiruthani - Renigunta Road) & junction of Km 6/4 of Vanagaram- Ambattur Road.
  • Construction of Grade Separator at Km 68/4 of NH-205 (Chennai -Thiruthani - Renigunta Road) and SH-55 (Mount - Poonamallee - Avadi Road) at Km 20/8.
  • Construction of Grade Separator at the Junction of Km 4/2 of Madhavaram Redhills road and Km 19/100 of Inner Ring Road.
  • Construction of Multi-level Grade separator on Mount – Poonamallee – Avadi road from MIOT Hospital to Mugalivakkam (via) Ramapuram, L&T and DLF.
  • Construction of Grade Separator at Km 17/2 of Marmalong Bridge – Irumbuliyur Road at the intersection of MBI Road and Madambakkam road.
  • Construction of Grade Separator at Km 80/7 in Chennai – Thirutani - Renigunta Road (NH205) at Korattur
  • Construction of Grade Seperator at the intersection of Pallavaram - Kundrathur Road and CKS Road at Kundrathur.
  • Extension of Vadapalani Grade Separator up to Ashok Pillar Junction.
  • Construction of Grade Separator at Km 6/5 of Marmalong Bridge - Irumbuliyur road near Kaiveli, Madipakkam.

 ROBs/ RUBs WITHIN CMA

Sl. No Nomenclature Cost (Rs. in Crore)

Work in Progress

1

LC No.4 - Construction of RUB near Korattur Railway station

19.97

Work to be taken up

 

2

LC No.32 - Construction of ROB near Perungalathur Railway station

206.83

Works in LA & DPR Stage

3

LC No.14 - Construction of ROB near Veppampattu Railway station (LA)

29.50

4

LC No.4 - Construction of RUB near Tiruvottiyur - Ennore Railway stations.(DPR &LA)

28.00

5

LC No.6 - Construction of RUB near Tiruvottiyur - Wimco Nagar Railway stations.(DPR)

25.50

6

LC No.16 - Construction of ROB near Nandhiyambakkam - Minjur Railway stations.(DPR &LA)

28.32

     

7

LC No.22 - Construction of RUB near Tirusulam.(DPR)

14.00

8

LC No.27 - Construction of Limited Use Subway near Chrompet Radha Nagar.(DPR &LA)

28.99

TOTAL

388.11

WIDENING OF ROBs WITHIN CMA:

          As the width of the existing ROBs in the following locations is in-sufficient for the present day traffic requirement, widening is proposed.

  • Widening of ROB at Km 20/8 of Mount - Poonamallee - Avadi road at a cost of Rs.11.03 Crore is proposed for inclusion under Railway Works Programme 2019-20 on cost-sharing basis.
  • DPR for Widening of ROB to dual four lane at Km 12/2 - 13/2 of Inner Ring Road is being prepared. On completion of DPR, the work will be taken-up by the Department.

RIVER BRIDGES

Sl. No Nomenclature Cost (Rs. in Crore)

Work Completed

1

Widening of High level bridge(HLB) at Km 2/6 across the river Adyar in Mount – Poonamallee Road near Ramapuram

17.00

 

Works In Progress

 

2

Construction of HLB  across Buckingham Canal at Km 0/6 of Thiruvottiyur - Ponneri- Panchetty Road.

58.64

LA in Progress

 

3

Construction of HLB across Coovum river at Km 14/4 of Mount –Poonamallee - Avadi road at Paruthipattu - Thiruverkadu Municipal Road.

7.40

4

Construction of HLB across Coovum river at Nolambur road junction in NH 4

36.00

DPR in Progress

 

5.

Construction of High level Bridge across Coovam river at Padikuppam connecting Mugappair East with Koyambedu CMRL Station

--

     

Total

119.04

FORMATION OF NEW LINK / WIDENING OF ROAD WORKS:

Sl. No Nomenclature Cost (Rs. in Crore)

LA in progress

 

1

Formation of Tambaram Eastern Bypass Road Km0/0 – 8/4 (LA only)

75.50

2

Six laning of ECR from Thiruvanmiyur to Akkarai Km 11/8 – 23/2 (LA only)

778.00

3

Forming link road and construction of Bridge across Buckingham canal connecting Rajiv Gandhi Salai and East Coast Road at Neelankarai

204.20

4

Formation of New Link road connecting Greenways Road (DGS Dhinakaran Salai) with Durgabhai Deshmukh road through TamilNadu Music College(Land Transfer)

22.84

 

Work In progress

 

5.

Formation of Tambaram Eastern bypass Road Km 5/450 – 8/080 (LA Completed Stretch)

36.69

     

GRAND TOTAL

1117.23

PEDESTRIAN INFRASTRUCTURE FACILITIES

                Pedestrian, the most Vulnerable Road User (VRU), is often the victim of road traffic accidents. Through pedestrian specific projects, pedestrian fatalities are prevented and reduced.

SKYWALK

An innovative approach such as Skywalk, which is an elevated walkway built over a road, linking 2 or more locations, is an appropriate solution for safe & secured pedestrian crossing.

The gateway to the Chennai City is Tambaram. Railway station, Mofussil bus terminal and Metropolitan Transport Corporation (MTC) bus stand in Tambaram are located on both sides of the GST road. High volume Pedestrian traffic is experienced at this location. The FOB and Skywalk with escalator connecting Tambaram railway station and Bus Stand have been sanctioned for Rs.19.75 Crore, to alleviate this problem. The work is in progress.

Further, DPR is being prepared for Providing Skywalk, Escalator and other accessories connecting Eastern and Western parts of Tambaram town with the existing Bus stand, Tambaram Railway station including improvements to existing Bus stand.

WORKS SANCTIONED DURING 2018-19

The preparation of DPR is being carried out to decongest the traffic at the following locations.

  • Construction of ROB at Km 75/6 of Chennai- Thiruttani – Renigunta Road (SHU148) in lieu of Existing two lane ROB.
  • Construction of Grade Separator at the junction of Sardar Patel Road and Rajiv Gandhi Salai at Madhyakailash.
  • Construction of Foot Over Bridge with Escalator at Km 9/300 in Inner Ring Road near Kendriya Vidhyalaya School.